Sign In | Join Free | My gimpguru.org |
|
Brand Name : Xinyun
Model Number : XY-BT-288V
Certification : CE
Place of Origin : Quanzhou,Fujian
MOQ : 1
Price : 20,000-36,000USD
Payment Terms : T/T, Western Union
Supply Ability : 200sets/year
Delivery Time : 60-70 days
Packaging Details : steel to woolen
Model : Xy-Bt-288v
Unfold Size of Finished Products : 210(L)X230±2mm Other Sizes Are Available
Folded Size of Finished Products : 105(L)X230±2mm Other Sizes Are Available
Raw Material Inner Core Diameter : 76.2mm (Other Sizes Are Available)
Production Speed : 900 Sheets/Line/Min
Power : 7.5-35kw (380V 50Hz 3phases)
Programmable Controller : PLC Computer Controller
Transmission Unit : Timing Belt and Flat Belt
Embossing Unit : Steel to Steel
Model | XY-BT-288V |
Unfold size of finished products | 210(L)X230±2mm Other sizes are available |
Folded size of finished products | 105(L)X230±2mm Other sizes are available |
Raw material inner core diameter | 76.2mm (Other sizes are available) |
Production speed | 900 sheets/line/min |
Power | 11-45Kw(380V 50Hz three phase) |
Programmable controller | PLC computer controller |
Folding type | Vacuum suction " V" fold |
Transmission unit | Timing belt and flat belt |
Counter | Ink marked |
Embossing unit | Steel to steel |
Slitting unit | Pneumatic dot slitting |
Pneumatic system | 3HP Air compressor, mini air pressure 5 kg/cm2 (provided by customer) |
Overall dimension | Depends on Machine Model |
Weight | Depend on the size and configure |
Packing:
In wooden pallet
Most of the electrical and electronic components are equipped as per export standard.
Guarantee period:
One year for mechanical parts, after-sales service is lifelong , and we offer the spare parts at preferential price long.
Technical support:
We can send the technician to your factory to install the machines and
train your workers. And you shall pay salary(100USD/day) and round-trip air tickets from
China factory to your factory, the charge of visa, food ,transportations and accommodation in your city.
Payment term:
30% down payment should be paid by T/T, the 70% balance should be paid by T/T or confirmed irrevocable L/C by draft at sight.
Material:
The customer can get the material from their local market or we can recommend supplier to you.
Lead time:
Within 60-90 days inform the customer to inspect the machine at seller’s site after receiving the down payment and the confirmation of machine drawing.
![]() |
Xinyun 3HP Compressor Paper Towel Making Machine Interfolding 35kw Images |